2)prune (with a saw and while balancing halfway up) a lilac tree into manageable height. pile cuttings with preexisting pile of grapevines, move both to brush pile. (see waaay back on the right in the pic)
3)survey the
4)load all icky wood into trailer. fill it.
5)rake the newly exposed ground so that all bits of asphalt, nails, etc. are closer to the remaining
6)pick up rocks and toss them into the driveway for awhile.
7)hang two loads of laundry.
why yes, I do believe that "counts" as a pretty good WOD. Now to survey the pile of chocolate on the counter.
1 comment:
Awesome to be able to hang laundry out in March! I've been hanging mine out for the last few days, too.
Post a Comment